Pagini Yard
The team was asked to remove and replace the old distribution boards with new ones. The new distribution boards were built in the workshop. Once the boards were completed, the old ones were removed and the new ones were installed.
The team was asked to remove and replace the old distribution boards with new ones. The new distribution boards were built in the workshop. Once the boards were completed, the old ones were removed and the new ones were installed.
The Pictures below, are field staff building switchboards for Laga Industries here at Niugini Power Systems Ltd’s workshop. We started off with assembling the frame, after that we fitted all components then finally installed the switchboards at Laga Industries.
The switchboard at the Water PNG’s Bore #3 at Taraka needed an urgent makeover and upgrade of its electrical switchboard. We did the best we could to upgrade and improve the switchboard. Its now looking better than it used to.
Upgrade the electrical switchboard at the water bore.
Water PNG’s Bore #3 at Taraka, Lae Morobe Province
Our team boarding Air Niugini’s Fokker Rabaul as they transit to Manus for the first time to start work on the Project.
The project started out as any project would. This is the project site.
We’ve done a lot since we started in Manus thanks to NKW Holdings. We had a team that was based on-site on a monthly rotational shift throughout the lifetime of the project.
In late 2017, NKW Group issues us a contract of carrying out electrical installations in the new Refugee Centre in Lorengau, Manus Province. The project ended on the 31st of July 2018. It was completed successfully.
We embarked on this major project at the beginning of the third quarter of 2017. The project ended on the 31st of July 2018. It was completed successfully.
Lorengau Refugee Camp, Lorengau, Manus Province, Papua New Guinea
Pulling together the distribution boards and running electrical wiring throughout the board.
Every member of the team plays an important role in getting the project done. Here, Bill and Palanga are running through with the team their task for the day.
Assembling a distribution board
We’re done installing the first batch of outdoor distribution boards and we’re moving onto the second batch.
We started this project at the beginning of January 2018. The project is expected to be completed by the end of March 2018. It is going as scheduled. And we expect to deliver it on time.
The project was completed successfully on time and within budget.
PNG Ports Corporations (PNGPCL) Lae Tidal Basin, Morobe Province, Papua New Guinea
Date: 24/10/2017 to 31/11/2017
Client: Angau Memorial Hospital
At Angau, we did the following: