Portfolio Category: Electrical Installations Major Projects

Lorengau Refugee Center

LORENGAU REFUGEE CENTER
NKW HOLDINGS LTD (MANUS PROVINCE)

Destination: Manus

Our team boarding Air Niugini’s Fokker Rabaul as they transit to Manus for the first time to start work on the Project.

Project Site

The project started out as any project would. This is the project site.

Outdoor Air Conditioning Units Installation

Project ended on July 31st 2018

We’ve done a lot since we started in Manus thanks to NKW Holdings. We had a team that was based on-site on a monthly rotational shift throughout the lifetime of the project.

In late 2017, NKW Group issues us a contract of carrying out electrical installations in the new Refugee Centre in Lorengau, Manus Province. The project ended on the 31st of July 2018. It was completed successfully.

Scope

  • Providing electrical reticulation to the refugee sites, which are spread over several blocks.
  • Installation of Air Conditioning units, Fire Detection and Alarm Systems including Switchboard Design & Construction on all refugee sites

Timeline

We embarked on this major project at the beginning of the third quarter of 2017. The project ended on the 31st of July 2018. It was completed successfully.

Location

Lorengau Refugee Camp, Lorengau, Manus Province, Papua New Guinea

 

Lae Tidal Basin Upgrade

LAE TIDAL BASIN UPGRADE
PNG PORTS CORPORATION LTD (PNGPCL)

Distribution Board Assembly

Pulling together the distribution boards and running electrical wiring throughout the board.

All hands on deck

Every member of the team plays an important role in getting the project done. Here, Bill and Palanga are running through with the team their task for the day.

Distribution Board Assembly

Assembling a distribution board

Installation

We’re done installing the first batch of outdoor distribution boards and we’re moving onto the second batch.

We started this project at the beginning of January 2018. The project is expected to be completed by the end of March 2018. It is going as scheduled. And we expect to deliver it on time.

Scope

  1. Upgrading existing outdoor distribution boards by replacing with newly fabricated boards
  2. Upgrade of power factor correction boards

Timeline

The project was completed successfully on time and within budget.

Location

PNG Ports Corporations (PNGPCL) Lae Tidal Basin, Morobe Province, Papua New Guinea

 

Angau Upgrades It’s Morgue

Date: 24/10/2017 to 31/11/2017

Client: Angau Memorial Hospital

At Angau, we did the following:

  1. Solar Panels Installation
  2. Upgrade to morgue refrigeration system